MOVE ME EGYPT SERVICES

Home moving in Cairo and across Egypt

Home moving: a practical guide

A home move starts with the furniture, the access route and the things you need to keep with you. We review both addresses, the floor levels and the pieces that may need dismantling before agreeing the work. A room count alone does not describe the size or difficulty of your move.

We dismantle and reassemble everything: every piece in the home is taken apart and put back together, we pack and arrange clothes, dishes and china in numbered cartons, and we hang paintings and wall art in their places in the new home before the crew leaves.

Plan the home by room and by access

Walk through each room and separate what moves from what stays. List actual pieces, measure large items and both sites' doors and lifts, and declare glass, stone, delicate finishes and appliances. A piece brought in before a doorway was fitted may not leave by the same route today. Access needs checking before a handling method is agreed.

Prepare a first-days box and keep medicines, keys, documents and valuables with you. Number packages by destination room and identify what must open first. Heavy books and crockery belong in manageable cartons rather than oversized boxes. Packing is about safe weight and support, not simply closing the lid.

Dismantling, protection and delivery

Glass, corners, upholstery and finished surfaces need protection matched to material and condition. Identify dismantled parts and fixings with their parent furniture. Glued, weakened or modified furniture must be assessed before taking it apart. Appliances should be emptied and prepared to manufacturer instructions; specialist disconnection and reconnection are not automatic moving tasks.

Agree building or compound access, parking, lift use and corridor protection. Disclose stairs, long carries and tight key-handover windows. At delivery, direct items to their rooms, reconcile the list and record observations. Extra goods or a failed lift may change time, method and cost and require an updated agreement.

Home moving in Cairo and across Egypt

What needs to be agreed

Furniture packing, room labels and an agreed loading order help the receiving team put each item in the right place. Dismantling and reassembly apply only to the pieces included in the written scope. Tell us if you are moving only part of the home.

Prepare these details

How the move is planned

  1. Share the inventory

    Send the collection and delivery locations, preferred date and a clear inventory. Photos help us identify missing information, but they do not automatically replace a site survey.

  2. Review access and the scope

    We review entrances, stairs, lifts and loading points, then identify packing, dismantling, transport and any work requiring another specialist.

  3. Agree the quote and responsibilities

    Check the included and excluded work, stages, contacts and receiving arrangements. Changes to the inventory or address need review before they become part of the plan.

  4. Prepare, move and hand over

    The team follows the agreed scope, with labels and inventory checks at delivery. Record visible observations at handover and keep important personal items with you.

Locations and availability

We welcome moving requests from all of Greater Cairo: Nasr City, New Cairo, the Fifth Settlement, the New Administrative Capital, 6th of October City, Sheikh Zayed, Maadi, Zamalek, Katameya Heights, Katameya Golf and New Giza. Our service covers every governorate in Egypt: Alexandria, the North Coast, Ain Sokhna, Suez, Hurghada, Sharm El Sheikh, El Gouna and beyond. We have worked everywhere in Egypt, and our crew reaches any address with the same planning and commitment. Send your area on WhatsApp and we will confirm the details and timing right away.

Survey and pricing

A quote depends on the inventory, volume, item type, distance, access and agreed packing, handling and assembly. We review the details and survey needs before a final offer. The household calculator is a planning tool, not a binding quote; it does not price company, factory, server, safe or piano moves, or inventories with unknown-volume items. Ask for the exact inclusions and exclusions before agreeing the work.

Frequently asked questions

Does an enquiry confirm a booking?

No. The team must review the request and agree the scope, availability and quote before the move is confirmed.

Is every task included automatically?

No. Packing, dismantling, handling, storage and specialist work depend on the written scope. Check the exclusions as well as the price.

What if my inventory or address changes?

Tell us before the move. A change can affect access, timing, equipment and price, so it needs review before acceptance.

Home moving: a practical guide

Decide what will move before measuring it

Sort each room into items to move, store or leave behind. Check whether furniture fits the new layout and can leave the old property. Room count alone says little about what will be loaded. If the destination is still being finished, explain when floors, entrances and lifts will be ready and whether delivery can be received safely.

List large pieces with condition photos and dimensions, plus an initial carton count. Whole apartment is not an inventory. Keep documents, medicines, keys and personal essentials with you and prepare a first-night bag. The inventory should support collection and delivery checks, not produce a quick price from incomplete details.

International moving

Measure the route as well as the item

A sofa can pass the front door but fail at a stair turn or inside the lift. Review doorways, corridors, lift interior and permitted load, corners, floors and carrying distances. Agree moving hours, parking, service-lift access and floor protection with building management. A facade photo does not establish a safe handling method.

Declare heavy, fragile or external-lift items early with known dimensions and weights. A furniture lift is not suitable for every site; load, positioning and obstacles need review. Do not exceed lift rules or remove building protection to keep a timetable. Changed access on the day requires a revised plan before different work proceeds.

Packing

Use the household calculator as an estimate

Add only actual items. Bed and mattress are separate calculator entries, so avoid adding a mattress twice. Large wardrobes, fitted units and special furniture need measurement and dismantling review. Packed volume can differ from assembled size. Item values are planning assumptions, not measured facts about your home.

The approved household method plans 20 m³ per truck and rounds up to whole vehicles, using Stretch, Single and VIP planning tiers. Inventory, access and the packing/assembly scope must be reviewed before a final quote. It does not price factories, restaurants, servers, safes or pianos. Request a separate review for special contents. An estimate does not reserve a date.

Use the container planner

Define packing and dismantling responsibilities

Not every piece can be dismantled, and not every assembly task is included. Older or modified furniture may have hidden fittings; other pieces attach to walls or services. Explain materials, condition and previous repairs. Number accessory bags to match the item and agree which tasks need another specialist. Gas, electrical and plumbing work are not automatically part of furniture handling.

Label cartons by room, number and short description. Avoid oversized boxes of books and heavy loads above glass. Protection depends on surfaces, edges, weight and journey, not one fixed layer count. If storage will interrupt the move, disclose it early because duration, access and preparation can change the packing plan.

Use the container planner

Read the scope before fixing the date

Ask for a written inventory, addresses, floors, lift assumptions, packing, dismantling, assembly, loading and unloading scope. Clarify unpacking and room placement, exclusions, waste removal, cleaning and appliance work. Changes to inventory, address or lift access may require a revised scope rather than the same plan.

Review the service tier, taxes and how extras are approved. Ask explicitly about insurance, liability limits, exclusions and condition reporting; safe wording is not an insurance policy. Confirm the quote and date with the team. A message, calculator result or prepared transfer notice does not automatically confirm a booking.

Packing

Prepare the property and decision-makers

Choose one person to approve changes and someone to receive at the destination if you will be absent. Arrange entry permission, parking and lift access. Keep children and pets clear of handling routes. Mark belongings that must not move, and keep corridors and lighting suitable rather than stacking cartons across the exit.

Prepare appliances with a specialist, including drying and defrosting where needed. Photograph important items and report changes before the team arrives. Do not dismantle or lift a heavy piece yourself merely to save time without a safe plan. Late access or permit readiness can affect later stages of the move.

International moving

Deliver room by room and check the inventory

Label destination rooms and share furniture placement before unloading where possible. Confirm access and which pieces remain packed or enter storage. Putting everything in one room and carrying it again adds handling and makes inventory checks harder. Review changes to large-item placement before moving them again.

Match cartons and items to the list, recording shortages, visible damage or reservations on the handover document with photos. Check agreed assembly, while remembering that placing an appliance does not establish specialist connection or testing. Keep keys and accessories accounted for and follow written reporting deadlines. Do not sign inaccurate handover information just to finish quickly.

Request an inventory review

Recognise moves needing a different plan

Villas and multi-storey homes may need different floor sequencing, entrances and loading areas. Intercity moves need route and handover coordination; storage adds duration and retrieval conditions. A safe, piano or heavy machine is not ordinary household cargo because it sits in a home. Declare it separately with known measurements, weight and route photos.

For an international move, use the international guide and container planner rather than treating a local truck estimate as a freight quote. Documents, customs and carrier acceptance require separate checks. Prepare inventory, both addresses, date and important-item photos, use the calculator to start discussion and request an actual review before agreement.

Storage

Official personal-effects and residence-transfer checks: Zoll · Egyptian Customs ·

Request an inventory reviewUse the container planner

From any governorate to any other governorate in Egypt

MOVE ME EGYPT moves furniture and belongings from any governorate to any other governorate in Egypt. Your move can start in Cairo or any other governorate. Send the collection and delivery addresses, inventory and requested date, and our team will arrange the details with you.

Calculator planning tiers apply only within Greater Cairo. Moves outside that pricing scope and between governorates receive a special offer on request.

For corporate relocation in Egypt or office moving in Cairo, start with departments, access windows, inventory and restart responsibilities. Commercial relocation is planned around operations, without a zero-downtime promise.

Choose moving services around your contents, both locations, access and date, not a nearby search label alone. Service scope, availability and the quote require inventory review.

Home and apartment moving

For a home or apartment move in Cairo, Alexandria or between Egyptian cities, provide both areas, floors, lifts and oversized items. Compare the same inventory and scope rather than price alone, including packing, assembly and carrying distances.

Move distance scope

Tier planning prices are fixed within Greater Cairo, and the calculator prices listed inter-governorate routes with a distance factor on the same tiers: Alexandria, the North Coast, Ain Sokhna, Suez, Ismailia, Port Said, the Delta governorates, Minya, Assiut, Hurghada, El Gouna, Sharm El Sheikh, Luxor and Aswan. Governorates outside the list get a custom quote on request after distance, inventory and access review. This is a pricing scope, not an administrative classification of cities.

Do calculator prices apply in every governorate?

Yes. The calculator prices the listed inter-governorate routes with a distance factor on the same Greater Cairo tiers. Choose the pickup and delivery governorates in the two lists; unlisted governorates get a custom quote on request after distance, inventory and access review.

MOVE ME EGYPT services, from inspection to installation

We provide a full range of furniture and belongings relocation services, with a free pre-move inspection and consultation and professional supervision throughout the move.

  • Comprehensive insurance for your movables.
  • Upper-floor furniture lifting and transport up to the 30th floor, with hydraulic lifts and telescopic cranes.
  • Furniture dismantling and reinstallation, premium multi-layer packing and a range of packing materials.
  • Packing and transport of glass, antiques, china, vases, valuable personal items and artwork.
  • Packing and transport of electrical appliances, servers, IT equipment and sensitive electronics.
  • Electrical services: dismantling and installation of chandeliers and wall lights.
  • Plumbing services: removal and installation of water heaters.
  • Air-conditioner dismantling, installation, transport and shipping.
  • Transport of heavy safes, heavy sports equipment, carpets and curtains.
  • Numbering and coding of items, trained human-chain handling and enclosed transport trolleys.
  • Uniformed teams, professional supervisors, equipment installation, start-up adjustment and maintenance services.

Execution details, insurance coverage and suitable equipment are set out in the quote for the inventory, access and inspection. Calculator planning prices apply only within Greater Cairo; moves outside it and between governorates receive a special offer.

Moving-day guide: clear responsibilities before the first item leaves

Use this checklist to prepare your home move and compare quotes against the same details. Homes do not need identical tasks or equipment. Mark the work you need and agree it with the team before execution.

Before inspection: make an inventory that can be used

Work room by room. Record each piece, quantity, approximate size and whether it moves intact or needs dismantling. Distinguish a wardrobe from its contents, a bookcase from its books and a display cabinet from its glassware. Include balconies, stores and corridors that room photos may miss. A room count alone does not define materials or vehicle needs.

Divide the list into moving, staying, storage and personally carried items. Give every group a destination, especially for multi-address delivery. Tell the team about material changes after inspection, such as additional appliances, storage units or a different floor. The scope can then be reviewed before moving day rather than at the loading door.

Before packing: separate sorting from protection

Packing does not replace sorting. Remove documents, medicines, keys, jewellery and sensitive records that you will keep with you. Identify cabinets or cartons that must not be opened. Decide what happens to food, liquids and cleaning products before they are placed with furniture. Declare breakable, leaking or specially controlled contents for review rather than hiding them in an ordinary carton.

Keep appliance connection photos, model references and manufacturer instructions when available. Review electrical and water disconnection and fridge or washing-machine preparation with the specialist. For lighting, heaters and air conditioners, state unit quantities, locations and the work needed at each address. The services are offered; a clear request helps arrange the actual work.

Check access before choosing a lifting method

Show the full path from room to vehicle and from vehicle to the new room. Identify narrow doors, turns, stairs, lifts and unusually long or heavy pieces. Confirm moving hours, gates, waiting space and required permissions with building management. An item having entered before does not prove the same exit path remains after doors or interiors change.

Upper-floor lifting services reach up to the 30th floor, while the suitable method and equipment are reviewed for the item and site. Do not reserve equipment space or remove building barriers without agreement with the responsible people and team. Record who arranges permissions and who attends collection and delivery.

During packing: connect numbers to rooms and pieces

Use clear destination-room names in the carton list. Kitchen carton one is easier to reconcile than miscellaneous. Keep fittings, screws and assembly instructions linked to the relevant item number. Agree how they will be secured without damaging finishes.

Avoid sensitive descriptions on carton exteriors. Use a code linked to your private list instead. Prepare first-night essentials separately and keep them with you or identify their location clearly. Reconcile carton and item counts at collection, including pieces handed over separately or scheduled for a later stage.

At delivery: check the handover

Appoint a receiver who knows the inventory and room layout and can reach the decision-maker if you are absent. Count cartons and check visible condition before signing according to the agreed handover process. Record specific shortages or concerns and keep suitable photos. A precise item number and observation are more useful than an unrecorded general phone call.

Distinguish placement, assembly and operation. Furniture, appliances, lighting and air conditioning may have different steps within the agreed scope. Confirm completed and outstanding work and the person following up. For potential damage, request the reporting and claims process under the policy and agreed terms; do not assume compensation before review.

Compare the same scope

Check inventory, addresses, floors, materials, dismantling, assembly, lifting, insurance, taxes and delivery points. Ask what happens if the inventory changes or access to the new property is delayed. A lower total may describe different work. Calculator tiers cover Greater Cairo only; other and inter-governorate routes receive a special offer. Your move can start in any Egyptian governorate and finish in any other.

Household scenarios and questions for choosing the move scope

These are preparation examples, not client stories or final prices. They identify information that can change the plan and questions to settle before accepting a quote.

Moving into a partly furnished property

Do not copy the old inventory unchanged if the destination already has a kitchen, appliances or wardrobes. Identify landlord property, your property and items staying by agreement. Give every moving piece a destination and decide what happens to the rest before packing. An unwanted piece should not silently become an unpriced storage trip or extra delivery stop.

Illustrative example: your fridge moves, but another fridge remains at the new property temporarily. The question is not simply how many fridges exist. Establish the arriving appliance's position, connection responsibility, suitable space and access. Send those details rather than assuming the overlap can be resolved on moving day without scope changes.

Moving to a smaller home

Compare large-item dimensions with their intended positions before sorting cupboard contents. Do not leave keep-or-remove decisions until loading. If belongings split between home, storage and a relative, record each destination, its quantities and receiver. A single address in the request does not describe a three-stop move.

Dismantling does not mean resizing. Bespoke joinery or redesign is not an automatic transport outcome. Where alteration is needed, identify the specialist, timing and responsibility and decide whether delivery occurs before or after modification. One unresolved furniture decision should not silently change the whole day's plan.

Keys are available on different dates

Declare any gap between leaving and receiving the new home at the first enquiry. Review storage, expected duration, possible changes and retrieval rather than selecting a delivery date with nobody able to receive. Name the person approving extensions or redelivery and define each stage in the quote.

Keep clothing, documents, medicines and work essentials available during the gap. Storage does not establish instant access to a particular carton. Discuss partial retrieval before loading and use clear group codes for anything likely to be needed early. Retain your own inventory rather than relying on memory.

Working from home

Plan the workstation separately: desk, chair, monitors, computer and accessories, including who disconnects and tests them. Keep sign-in credentials and verification methods with you, never on labels or in the inventory. Physical device arrival does not establish working internet at the new address.

Choose acceptable work interruption and test any fallback before relying on it. Do not schedule an important meeting against an estimated vehicle arrival. Declare servers, company-owned equipment or non-household sensitive devices; these may need a different review and quote rather than an extra item in a room estimate.

Is a survey needed or are photos enough?

Photos and inventory are useful starting evidence when they show dimensions, routes and both addresses. They can still miss a tight turn, fixing, weight or condition needing direct review. The team determines survey needs; pre-move inspection and consultation are available free. Sending a video is not a confirmed booking or approval of every item shown.

Use useful angles and lighting without exposing unrelated private papers. State what the images do not show rather than expecting the team to infer it. If fitout or inventory changes after inspection, update the team before execution. An earlier survey describes the earlier state, not every later change.

Does a package include all materials and tasks?

A package name does not replace written inclusions. Identify materials, dismantling, assembly, lifting, insurance and requested electrical, plumbing or AC tasks, with the address where each occurs. A quote describes the agreed work, not every service the company offers in general.

Calculator planning tiers apply only within Greater Cairo after scope selection. Other routes receive a special offer, including governorate-to-governorate moves not involving Cairo. Do not compare a household estimate directly with work involving stages, equipment or contents outside that estimate's scope.

What should the first request contain?

Send both addresses, governorates, districts, floors, lift details, requested date, a short inventory and access or large-item photos. Add storage, extra stops, technical tasks, entry conditions and any substitute receiver. Explicitly mark unknowns such as safe weight or property readiness so they are reviewed rather than guessed.

After the quote arrives, check its details instead of assuming every old chat note was carried into it. Keep the agreed version and execution-day contact. A price enquiry starts planning; fixing the move date follows scope and availability confirmation and the agreed booking process.

People, private records and changes on moving day

A home move needs clear owner decisions as well as packing and handling. This section covers family arrangements, communication and readiness. It is not medical or legal advice or a promise that timing cannot change.

Different family access needs

Ask the person or their authorised carer what must remain available, such as a chair, bed or daily-use bag. Do not place an essential item in the last storage group without agreement. Arrange personal travel and any assistance separately from furniture transport. A moving crew is not automatically responsible for passenger transport or care tasks.

For assistive or health-use equipment, consult its provider or appropriate specialist before disconnection or preparation. Do not describe it as ordinary furniture. Share handling and access needs, not a medical history. Medicines, care and safe equipment use remain decisions for the person and relevant professional, not a general moving guide.

Children, pets and work routes

Choose a responsible person and a space away from carrying and loading routes. Doors may remain open and people move repeatedly; do not rely on the crew noticing a child or animal leaving. Keep essential toys or supplies with the family and coordinate arrival without obstructing furniture unloading.

If a family room needs early attention, mark it as a layout priority. That helps sequence review; it is not an unconditional completion deadline. A priority label does not make an unfinished room or unsuitable route ready for a bed or other item. Discuss readiness before arrival.

Clothes and household linen

Separate immediate-use clothing from items that can wait and identify hanging versus folded contents. Hanging wardrobe cartons can organise suitable garments but are not one method for all clothes, loads or accessories. Review the quantity and suitable contents before the packing plan is agreed.

Group clean, dry linen by destination. Closed packaging does not remedy damp or unprepared contents. For storage, state expected duration and early-retrieval needs. The inventory should describe what is actually handed over, not just the number of wardrobes. Keep first-night bedding separate if the family needs it before general unpacking.

Condition photos without unnecessary exposure

Photograph the item, route and relevant condition while checking the background. Open documents, private family photographs, card numbers and account screens are not normally needed to plan furniture handling. Remove or obscure them without hiding the item details needed for review.

Keep suitable original condition images with a date and inventory reference. Avoid filters that change a finish or conceal the observation. A picture alone does not establish the cause of a defect. Use the agreed reporting route rather than exposing private material or treating an unclear photo as a proven cause.

Keys and entry responsibilities

Name the people opening collection and delivery sites and their availability. Check keys for floors, stores, service gates and separately controlled parking. The person unlocking may not have authority to change furniture positions or approve extra work. Separate entry contact from decision approver.

Agree an agent's access responsibilities directly with them. Do not put key locations or lock codes on cartons or in group messages. The team needs the proper contact, not unnecessary access secrets. Keep the only entry method out of a later-delivery carton. Report an unavailable or changed agent before execution.

A clear change note

For every change, state old detail, new detail, required date and review needed. Illustrative example: delivery changes from floor one to floor three and the lift does not fit the large piece. This may change route and equipment, not merely an address label.

Request confirmation of scope, price or timing effects. A received message is not final acceptance. Retain the updated quote or agreed record. Until the responsible person confirms it, label the change under review rather than confirmed. This prevents an unresolved assumption becoming a crew instruction.

Unexpected conditions during execution

Declare unlisted items, an unavailable lift or delayed entry to the responsible contact. Let that person review options with the team. Do not push for an unplanned carrying, dismantling or lifting trial simply to hide the impact of a change. A customer's preference alone does not establish a suitable method.

Possible reviews include resequencing, holding a defined item, considering different equipment or another date. Each option needs scope, price and availability confirmation; its appearance in a guide does not approve it. Record what was agreed and what remains unmoved or open for follow-up.

Keep a post-delivery file

Collect the agreed quote, inventory, handover records, observations, suitable images and contact details. Separate completed work from assembly, testing or specialist responses still pending. An unopened carton is not automatically missing, and an untested device is not automatically faulty.

For insurance follow-up, request actual policy procedures, documents and deadlines. This guide invents no reporting window or settlement percentage. Keep precise item reference, location, observation time and description. A usable file means each follow-up can be understood without repeatedly reconstructing the entire move.

Read the home-moving quote line by line

A written offer turns a broad conversation into a reviewable scope. These explanations do not invent contractual conditions. They identify questions to settle in the version agreed with the team.

The agreed inventory

Which list underpins the offer: latest photos, survey inventory or an updated file? Three lists with different quantities are not a clear basis. Check large pieces, accessories and expected cartons, including unknown-size or special-review items.

If a number is provisional, ask what changes it and how review occurs before execution. A room label does not mean unlimited cartons or everything later found in storage. A clear inventory permits changes to be identified and agreed rather than disputed as an assumption.

Addresses and access

Check both addresses, floors, entry points and extra stops. District names do not replace site details. If using a pictured lift needs permission or a time slot, say so. Its existence is not proof of moving-day availability.

Vehicle-to-door distance, turns, narrow openings and lifting positions are execution details. Ask how changes affect the plan instead of assuming every alternative route is included. Entry and unlocking responsibilities should be known before the team is dispatched.

Materials and packing

Identify what the team packs and what you prepare, with contents needing separate protection. Premium packing does not alone specify carton numbers or handling of glass, clothes and devices. Agree a plan for the real inventory rather than a promise that one material suits everything.

Ask whether unpacking or removal of used materials is included if needed. Keeping packaging and disposing of it are different arrangements. Show available original appliance packaging at inspection so suitability is reviewed rather than assumed from its presence.

Assembly and technical tasks

Name pieces to dismantle and reassemble and accessories linked to each. Available electrical, plumbing and AC services still need quantities, address and requested tasks. Removing an appliance at origin does not prove destination connections are ready or alterations included.

Repair, resizing and alteration of a fixed installation differ from transport. Ask about arrangements and boundaries before confirmation. Do not leave installation with different meanings for you and the crew, particularly when a supplier or building representative also has an acceptance role.

Insurance and the financial review

The company provides comprehensive movables insurance. Request actual policy, coverage, exclusions, liability and reporting procedures. A generic description does not establish a settlement amount or unknown deadline. Keep required inventory, suitable condition records and valuation information under the policy process.

Check total, taxes, phases, equipment, storage, booking and change arrangements. Fixed calculator planning prices apply only within Greater Cairo. Other and inter-governorate routes receive a special offer. Compare the same work and terms, not a preliminary household number against a different final scope.

Handover and closeout

Ask who receives against which list and how delivered, assembly-pending and review-pending items are recorded. Identify multiple handover stages. Understand what a receipt actually confirms rather than treating a general signature as a substitute for clear records.

Keep the agreed version, open observations and follow-up contact afterwards. Close each issue against a specific result, not simply elapsed time. The review should leave you knowing what will be delivered and what still needs an owner decision or specialist check.

Final compartments and intentionally retained items

Check easily forgotten compartments before handing over furniture: a small bedside drawer, storage seat, under-bed unit or store cupboard. Do not reach into an unseen mechanism or dismantle a part simply to search. Review accessible contents and ask the appropriate specialist where needed. The aim is to remove personally retained items and make the inventory match what is actually being entrusted.

If a piece stays for the landlord or another buyer, identify it clearly and agree its separate handover. A verbal remark to one person may not reach every team entering the property. During the final walk-through, distinguish deliberately retained items from pieces that should have been loaded. This keeps an intentional exception from becoming an unexplained missing-item report.